Screenshot Preview

DlhSoft Gantt Chart Light Library for Silverlight/WPF

经 DlhSoft - 产品类型: 构件 / .NET WPF / Silverlight

‏请注意: 除非另有说明,此为英语产品

*

Add interactive Gantt charts to your Silverlight and WPF applications. Gantt Chart Light Library for Silverlight 4/WPF 4 contains task hierarchy and resource scheduling controls with increased runtime performance, standard DataGrid feature inheritance, data binding support, customizable look and feel, task and dependency drag and drop operations, support for displaying resource groups and spreading conflicting assignments on multiple lines in a single row, critical path enumeration, baseline visualization, resource leveling, culture awareness, printing and exporting support, undo/redo queue, two-way Microsoft Project XML compatibility, resource allocation load chart output, PERT chart and network diagram output, Model-View-ViewModel (MVVM) pattern based development support (Prism), etc. The interactive Gantt Chart and Schedule Chart can be used to display all types of data that can be presented on a timeline and can be used to display tasks, appointments or other activities for short or long periods of time. Use these components to build project management, resource planning, activity scheduling, item programming, execution planning, equipment rental, location sharing, assembly-line production and many other related types of applications.

$848.95

‏我们的常规价格如下。 请登录后查看打折后的价格。

价格

DlhSoft Gantt Chart Light Library 4.3.3 for Silverlight 4/WPF 4   *

加入购物车 $ 848.95 Personal License (Single user, Up to 2 computers)  *
Mfr. 部件号: DLH-GCLL-4-PL
下载 (13.5 MB)
加入购物车 $ 1,697.91 Small Business License (Up to 5 users, Up to 10 computers)  *
Mfr. 部件号: DLH-GCLL-4-SBL
下载 (13.5 MB)
加入购物车 $ 3,395.81 Business License (Unlimited users, Unlimited computers)  *
Mfr. 部件号: DLH-GCLL-4-BL
下载 (13.5 MB)
加入购物车 $ 7,277.43 Business Plus License (Unlimited users, Unlimited computers, Source code included (delivered separately))  *
Mfr. 部件号: DLH-GCLL-4-BPL
下载 (13.5 MB)

DlhSoft Gantt Chart Light Library 4.3.3 for Silverlight 4/WPF 4 - Upgrade from Gantt Chart Light Library 4.0/4.1 for Silverlight 4/WPF 4   *

加入购物车 $ 848.95 Small Business License (Up to 5 users, Up to 10 computers) - Upgrade from Personal License  *
Mfr. 部件号: DLH-GCLL-4-SBL-UPG
验证 下载 (13.5 MB)
加入购物车 $ 2,546.86 Business License (Unlimited users, Unlimited computers) - Upgrade from Personal License  *
Mfr. 部件号: DLH-GCLL-4-BL-UPG
验证 下载 (13.5 MB)
加入购物车 $ 6,428.48 Business Plus License (Unlimited users, Unlimited computers, Source code included (delivered separately)) - Upgrade from Personal License  *
Mfr. 部件号: DLH-GCLL-4-BPL-UPG
验证 下载 (13.5 MB)
加入购物车 $ 1,697.91 Business License (Unlimited users, Unlimited computers) - Upgrade from Small Business License  *
Mfr. 部件号: DLH-GCLL-4-BL-UPG
验证 下载 (13.5 MB)
加入购物车 $ 5,579.53 Business Plus License (Unlimited users, Unlimited computers, Source code included (delivered separately)) - Upgrade from Small Business License  *
Mfr. 部件号: DLH-GCLL-4-BPL-UPG
验证 下载 (13.5 MB)
加入购物车 $ 3,881.62 Business Plus License (Unlimited users, Unlimited computers, Source code included (delivered separately)) - Upgrade from Business License  *
Mfr. 部件号: DLH-GCLL-4-BPL-UPG
验证 下载 (13.5 MB)

DlhSoft Gantt Chart Light Library 4.3.3 for Silverlight 4/WPF 4 - Upgrade from Gantt Chart Library 4.0/3.1 for WPF 4/3.5 or Project Management Library 4.0/3.1 for WPF 4/3.5   *

加入购物车 $ 848.95 Small Business License (Up to 5 users, Up to 10 computers) - Upgrade from Any License  *
Mfr. 部件号: DLH-GCLL-4-SBL-UPG
验证 下载 (13.5 MB)
加入购物车 $ 2,546.86 Business License (Unlimited users, Unlimited computers) - Upgrade from Any License  *
Mfr. 部件号: DLH-GCLL-4-BL-UPG
验证 下载 (13.5 MB)
加入购物车 $ 6,428.48 Business Plus License (Unlimited users, Unlimited computers, Source code included (delivered separately)) - Upgrade from Any License  *
Mfr. 部件号: DLH-GCLL-4-BPL-UPG
验证 下载 (13.5 MB)

DlhSoft Gantt Chart Light Library 4.3.3 for Silverlight 4/WPF 4 - Upgrade from Gantt Chart Library 3.0 for WPF 3.5 or Project Management Library 3.0 for WPF 3.5   *

加入购物车 $ 121.45 Personal License (Single user, Up to 2 computers) - Upgrade from Any License  *
Mfr. 部件号: DLH-GCLL-4-PL-UPG
验证 下载 (13.5 MB)
加入购物车 $ 970.41 Small Business License (Up to 5 users, Up to 10 computers) - Upgrade from Any License  *
Mfr. 部件号: DLH-GCLL-4-SBL-UPG
验证 下载 (13.5 MB)
加入购物车 $ 2,668.31 Business License (Unlimited users, Unlimited computers) - Upgrade from Any License  *
Mfr. 部件号: DLH-GCLL-4-BL-UPG
验证 下载 (13.5 MB)
加入购物车 $ 6,549.93 Business Plus License (Unlimited users, Unlimited computers, Source code included (delivered separately)) - Upgrade from Any License  *
Mfr. 部件号: DLH-GCLL-4-BPL-UPG
验证 下载 (13.5 MB)

我们的价格包括ComponentSource的技术支持。对于大多数可下载的产品,还提供在线备份和免费升级为新版本,若新版本在购买后的30日内发布的话。  所有销售都是按照我们的标准条款 进行的,并且适用我们的退货政策. 请 联系我们 若您需要任何未在列出的License選擇,包括批量License及以前的版本。

‏我们的常规价格见上。 请登录后查看打折后的价格。

 *

Differences between the Standard and Basic Editions

The Basic Edition does not incude

  • PERT chart support
  • Load chart support
  • Network diagram support

If you are not interested in these features please see the Basic Edition

What's new in DlhSoft Gantt Chart Light Library for Silverlight/WPF 4.3.3?

  • Multiple assignment selector controls (AssignmentListBox and AssignmentComboBox)

What's new in DlhSoft Gantt Chart Light Library for Silverlight/WPF 4.1.9?

  • Data binding support for item collection in Gantt Chart and Schedule Chart.

What's new in DlhSoft Gantt Chart Light Library for Silverlight/WPF 4.1.8?

  • AsyncPresentationCompleted event added to let the developer know when load/refresh is complete when using asynchronous presentation;
  • PrintingTemplate property added to provide arbitrary printing customizations;
  • Demo sample updated with more features: date picker and resource combobox, custom tooltips, custom printing with title header and page number footer.

What's new in DlhSoft Gantt Chart Light Library for Silverlight/WPF 4.1.7?

  • Internal updates to add support for Microsoft Project XML compatibility and for displaying multiple lines per row in a ScheduleChartDataGrid control

What's new in DlhSoft Gantt Chart Light Library for Silverlight/WPF 4.1.6?

  • Internal updates to add support for disabling summary value aggregation, and for custom code injection on setting a new predecessor item during a drag and drop based dependency line creation event;
  • Several new sample applications: custom scales (numeric days, minute level), drag and drop (within task hierarchy), task recurrence, summary bars (displaying child item bars in the line of collapsed summary tasks), persistence (XML files, SQL Server database), and Microsoft Project XML file import.

What's new in DlhSoft Gantt Chart Light Library for Silverlight/WPF 4.1.5?

  • Internal updates/corrections to enable support for displaying resource groups (indentation based hierarchy) within ScheduleChartDataGrid control
  • Samples added to show how to automatically aggregate custom values from child items to summary tasks, and how to perform zoom in or out on mouse wheel events within chart area of GanttChartDataGrid control

What's new in DlhSoft Gantt Chart Light Library for Silverlight/WPF 4.1.4?

  • Minor corrections to Finish-to-Finish dependency arrow drawings
  • New predecessor string-enabled methods for managing task predecessors

What's new in DlhSoft Gantt Chart Light Library for Silverlight/WPF 4.1.3?

  • New properties added to the GanttChartItem class: Completion (percent) and IsCompleted (Boolean)
  • Support added for allowing the developer to set up specific Gantt Chart bars as read only (i.e. having drag/drop disabled in the chart), while generally allowing the end user to drag/drop other bars as needed (behavior is now controllable through GanttChartView.IsBarReadOnly attached property which can be set to individual GanttChartItem objects);
  • More project statistics and related information retrievable through a few new/enhanced GetProject* and other Get* methods accessible through Gantt Chart control instances;
  • Connectors between Gantt Chart controls (which are task hierarchy oriented) and Schedule Chart or Load Chart control (resource assignment oriented) available through GetScheduleChartItems and GetLoadChartItems methods, running based on a disconnected mode approach (to increase application performance); the Get Started sample application has been updated to include code that show how developers can use these new advanced features;
  • Basic resource leveling algorithm (LevelResources method) was added to the control;
  • Critical path determination algorithm is enabled within the control (GetCriticalItems/IsCritical(item) methods); code that exemplifies highlighting the critical path was added to the Get Started sample application for the developer’s convenience.

 *

Free Upgrades
You are entitled to obtain a free upgrade to Gantt Chart Light Library 4.0 for Silverlight 4/WPF 4 Personal License if you have a license for Gantt Chart Library 3.1/4.0 for WPF 3.5/4 or Project Management Library 3.1/4.0 for WPF 3.5/4 –  please call us toll free or email us to request it.

DlhSoft Gantt Chart Light Library for Silverlight 4/WPF 4 Design Time Features (for developers)

  • Integrate with the Visual Studio development environment; reference documentation is available in Visual Studio style; supports all .NET languages, including but not limited to C# and Visual Basic .NET
  • Very similar in appearance, behavior, and development related features with the standard DataGrid, and ItemsControl controls
  • Programmatically allow task indentation, content, start and finish date and times, completion, assignments strings, predecessors, and expansion values, resource content values, allocation unit values, and bar tool tips
  • Use customized Gantt Chart scale headers, such as one or more of the predefined time scales (hours, days, weeks, months, quarters, years) or other user defined time scales, using the Scales property
  • Show or hide part of week days and/or part of day time in the Gantt Chart, using the Visible{Week|Day}{Start|Finish} properties
  • Set up a custom schedule defining the working time to be used for determining and updating task date and times and time spans using the Working{Week|Day}{Start|Finish} and NonworkingIntervals properties
  • Fully customize task and allocation bars, dependency lines, tree node expanders, and the general control user interface by using custom brushes, styles, and templates
  • Print or export images representing the task or resource grid and/or its associated Gantt Chart
  • Ability to load large collections of items, using an optional, enabled by default, asynchronous load mechanism; the component has been designed for optimal performance
  • Extensibility is provided through exposed properties, events, and type inheritance support

DlhSoft Gantt Chart Light Library for Silverlight 4/WPF 4 Runtime Features (for end users)

  • Ability to expand and close tasks, and/or update existing task values either from the data grid or from the Gantt Chart using drag and drop operations
  • The current culture (language and region) set by the end user (using the Regional and Language Options) is used by default for displaying and retrieving values such as numbers or dates and times
  • The standard Aero theme provided by the most recent operating systems (or simulated for other operating systems) in WPF applications, or the standard theme provided by the platform in Silverlight applications, is used by default.

DlhSoft Gantt Chart Light Library for Silverlight 4/WPF 4 Included Components

  • GanttChartDataGrid Control
  • ScheduleChartDataGrid Control
  • LoadChartDataGrid Control
  • GanttChartView Control
  • ScheduleChartView Control
  • LoadChartView Control

注意

还未完成翻译的产品说明, 我们提供了Google 翻译的连结方便您使用. 但请注意, 自动翻译有时候可能会有翻译错误.
强力驱动
在Firefox 和Opera 需要Flash.

产品搜索

输入搜索词:

为什么从ComponentSource购买?

ComponentSource 提供独特的全球国际服务, 在世界各地共有超过1,000,000开发者客户.

更多讯息 | 关于我们