Aspose.Tasks for Java V18.3

작업 목록과 바닥글 간의 간격을 없애기 위한 설정을 추가합니다.
4월 6, 2018
신규 버전

기능

  • Added support for setting a default font when a project is rendered to PDF.
  • Renumber WBS codes similar to Microsoft Project's "Renumber" function.
  • Added setting to eliminate the gap between the list of tasks and the footer.

수정사항

  • Task notes not saved for template file from MSP 2016.
  • Resource assignment units raise exception when large value is set.
  • Task duration becomes zero if multiple resources are assigned.
  • Project reading exception while loading MPP file.
  • Resource assignment has incorrect baseline start/finish date.
  • Font Family not set in MPP.
  • Header text is only changed for the default view.
  • Time phased data not added to the resource assignment time phased data collection.
  • Task Split parts lost while setting the %Complete.
  • Incorrect Link Type generated while saving project to MPX.
  • Summary task fields are empty.
  • getResourceAssignment().getByUid() function does not select proper entry.
  • MPP with formulas gets corrupted after saving.
  • Summary task is not updated for Actual Start, %Complete and Actual Finish.
  • Tasks with custom time phased data have different finish date while opened in MSP.
  • Recalculate raises exception.
  • Saving project file corrupts output file.
  • Project data lost after loading and saving MPP 2016 file.
  • Exception raised while loading project from memory stream.
  • GanttBarStyle not set for summary task.
  • XER file cannot be read with all cultures.
  • Dates and tasks duration are not correct.
  • Not all properties of extended attributes are filled.
  • Data lost when MPP file re-saved as MPP.
Aspose.Tasks for Java

Aspose.Tasks for Java

Microsoft Project 파일을 만들고 관리합니다.