Aspose.Tasks for .NET Releases

Released: Sep 3, 2018

Updates in V18.9

Features

  • Read activity codes from XER files.

Released: Jul 31, 2018

Updates in V18.8

Features

  • Added the ability to create a new recurring task in MPP files.
  • Added support for calculating custom fields by rollup option.
  • Extend support for saving HTML resources using MemoryStreams.

Fixes

  • Incorrect summary task constraint type.
  • End date option not working for some cases.
  • The task IsEstimated not saved in MPP format.

Released: Jul 3, 2018

Updates in V18.7.1

Fixes

  • Unable to use Aspose.Tasks in .Net 2.0 applications.

Released: Jun 5, 2018

Updates in V18.6

Features

  • Added support for the reading and writing of extended attributes for resource assignments.
  • Added additional validation for manual tasks and assignments without resources.

Fixes

  • Fixed calculation of Stop/Resume dates when assignment percent work equals 100.
  • Fixed calculation of Start/Finish dates when duration is set after them.
  • Fixed calculation of Stop/Resume dates of tasks during recalculation.
  • Writes contoured time phased data in the wrong way.
  • A HyperlinkBase project property value...

Released: May 7, 2018

Updates in V18.5

Features

  • Set default font when a project is rendering into JPG, BMP, PNG and HTML.

Fixes

  • Newly created calendar could not be assigned to a task.
  • StartDate and EndDate properties of SaveOptions are not working properly.
  • Fixed unnecessary thrown and caught exceptions on .mpp file opening.
  • Fixed CalendarException check order.
  • Non-informative exception when saving calendar with no working times defined.

Released: Mar 29, 2018

Updates in V18.4

Features

  • Ignore milliseconds when setting Task times.

Fixes

  • Exception while recalculating XML project.
  • Incorrect calculation of Tsk.ManualStart while Tsk.ActualStart is set.
  • MPP to PDF raises System.ArgumentException.
  • Duration errors while loading XML Primavera file.
  • Updating task progress by setting PercentComplete creates wrong output.
  • If Tsk.Start is empty the Tsk.StartText must contain task start date.

Released: Mar 14, 2018

Updates in V18.3

Features

  • Reduce the gap between a Task List and the document footer.

Fixes

  • XER file cannot be read with all cultures.
  • Task Split parts lost while setting %Complete.
  • Dates and tasks duration are not correct.
  • Not all extended attributes properties are filled.
  • MPP with formulas gets corrupted after saving.

Released: Feb 9, 2018

Updates in V18.2

Features

  • Re-number Microsoft Project WBS (Work Breakdown Structure) codes.
  • Now provides descriptive error messages when opening corrupted MPP files.
  • Added GetPageCount overload which depends on Start and EndDate dates.

Fixes

  • Recalculate raises exception.
  • Incorrect Link Type generated while saving project to MPX.
  • Saving project file corrupts output file.
  • ResourceAssignment.GetByUid() function does not select proper entry.
  • Project data lost after loading and saving MPP 2016 file.
  • Exception raised...

Released: Dec 1, 2017

Updates in V17.12

Features

  • Set a default font when a project is rendering to PDF.

Fixes

  • Task notes not saved for template file from MSP 2016.
  • Resource assignment units raise exception when large value is set.
  • Task duration becomes zero if multiple resources are assigned.
  • Project reading exception while loading the MPP file.
  • Resource assignment has incorrect baseline start/finish date.
  • FontFamily not set in MPP.
  • Header text is only changed for the default view.

Released: Oct 31, 2017

Updates in V17.11

Features

  • Set output image quality while saving as JPEG.
  • New fill pattern for MSP 2016 file format.

Fixes

  • Recalculate() is updating manually scheduled tasks.
  • Wrong finish date calculated for ElapsedDay type duration.
  • Prevent recalculation of manually scheduled tasks.
  • Wrong Actual Duration in MPP file.
  • SplitParts collection misses time span.
  • Sub-tasks not rendered while converting MPX to PdfA1b.
  • Wrong Finish date in XML file.
  • Wrong Percent complete in MPP as compared to XML output.
  • Loading project...