Aspose.Tasks for .NET Releases
Released: Sep 3, 2018
Updates in V18.9
Features
- Read activity codes from XER files.
Released: Jul 31, 2018
Updates in V18.8
Features
- Added the ability to create a new recurring task in MPP files.
- Added support for calculating custom fields by rollup option.
- Extend support for saving HTML resources using MemoryStreams.
Fixes
- Incorrect summary task constraint type.
- End date option not working for some cases.
- The task IsEstimated not saved in MPP format.
Released: Jul 3, 2018
Updates in V18.7.1
Fixes
- Unable to use Aspose.Tasks in .Net 2.0 applications.
Released: Jun 5, 2018
Updates in V18.6
Features
- Added support for the reading and writing of extended attributes for resource assignments.
- Added additional validation for manual tasks and assignments without resources.
Fixes
- Fixed calculation of Stop/Resume dates when assignment percent work equals 100.
- Fixed calculation of Start/Finish dates when duration is set after them.
- Fixed calculation of Stop/Resume dates of tasks during recalculation.
- Writes contoured time phased data in the wrong way.
- A HyperlinkBase project property value...
Released: May 7, 2018
Updates in V18.5
Features
- Set default font when a project is rendering into JPG, BMP, PNG and HTML.
Fixes
- Newly created calendar could not be assigned to a task.
- StartDate and EndDate properties of SaveOptions are not working properly.
- Fixed unnecessary thrown and caught exceptions on .mpp file opening.
- Fixed CalendarException check order.
- Non-informative exception when saving calendar with no working times defined.
Released: Mar 29, 2018
Updates in V18.4
Features
- Ignore milliseconds when setting Task times.
Fixes
- Exception while recalculating XML project.
- Incorrect calculation of Tsk.ManualStart while Tsk.ActualStart is set.
- MPP to PDF raises System.ArgumentException.
- Duration errors while loading XML Primavera file.
- Updating task progress by setting PercentComplete creates wrong output.
- If Tsk.Start is empty the Tsk.StartText must contain task start date.
Released: Mar 14, 2018
Updates in V18.3
Features
- Reduce the gap between a Task List and the document footer.
Fixes
- XER file cannot be read with all cultures.
- Task Split parts lost while setting %Complete.
- Dates and tasks duration are not correct.
- Not all extended attributes properties are filled.
- MPP with formulas gets corrupted after saving.
Released: Feb 9, 2018
Updates in V18.2
Features
- Re-number Microsoft Project WBS (Work Breakdown Structure) codes.
- Now provides descriptive error messages when opening corrupted MPP files.
- Added GetPageCount overload which depends on Start and EndDate dates.
Fixes
- Recalculate raises exception.
- Incorrect Link Type generated while saving project to MPX.
- Saving project file corrupts output file.
- ResourceAssignment.GetByUid() function does not select proper entry.
- Project data lost after loading and saving MPP 2016 file.
- Exception raised...
Released: Dec 1, 2017
Updates in V17.12
Features
- Set a default font when a project is rendering to PDF.
Fixes
- Task notes not saved for template file from MSP 2016.
- Resource assignment units raise exception when large value is set.
- Task duration becomes zero if multiple resources are assigned.
- Project reading exception while loading the MPP file.
- Resource assignment has incorrect baseline start/finish date.
- FontFamily not set in MPP.
- Header text is only changed for the default view.
Released: Oct 31, 2017
Updates in V17.11
Features
- Set output image quality while saving as JPEG.
- New fill pattern for MSP 2016 file format.
Fixes
- Recalculate() is updating manually scheduled tasks.
- Wrong finish date calculated for ElapsedDay type duration.
- Prevent recalculation of manually scheduled tasks.
- Wrong Actual Duration in MPP file.
- SplitParts collection misses time span.
- Sub-tasks not rendered while converting MPX to PdfA1b.
- Wrong Finish date in XML file.
- Wrong Percent complete in MPP as compared to XML output.
- Loading project...